Methodology: Data-Driven Engineering
TerraQuint combines rigorous analytical methods with practical field experience. Every recommendation is grounded in physics-based modeling, validated by production data, and optimized for economic return.
From Raw Data to Actionable Intelligence
Our four-phase methodology ensures technical rigor at every stage.
Data Acquisition & QA/QC
Gather production data, well tests, PVT, core data, and pressure histories. Rigorous quality control and data validation before any analysis.
Diagnostic & Analytical Modeling
Rate-transient analysis, decline curve methods, material balance, and pressure transient analysis to characterize reservoir behavior.
Integrated Simulation
Full-field reservoir simulation, nodal analysis, and facilities modeling to predict performance under various development scenarios.
Economic Optimization
Monte Carlo simulation, NPV/IRR analysis, and portfolio optimization to recommend the highest-value development path.
Our Technical Pillars
Nine integrated disciplines form the foundation of every TerraQuint engagement.
Reservoir Engineering & Simulation
Full-field dynamic reservoir modeling, history matching, and uncertainty quantification for conventional and unconventional assets.
- Finite-difference & streamline simulation
- History matching & forecasting
- Volumetrics & OGIP/PIIP estimation
Production Engineering & Field Optimization
Nodal analysis, artificial lift design, and integrated production system modeling from sandface to sales.
- ESP / Gas lift / Rod pump design
- Well performance analysis
- Production forecasting
Enhanced Oil Recovery (EOR)
Design and evaluation of waterflood, CO₂ injection, thermal recovery, and chemical flooding programs.
- CO₂ flood design & evaluation
- Waterflood & pattern optimization
- SAGD / thermal recovery
Decline Curve Analysis
Advanced production forecasting with probabilistic EUR assessment and rate-transient analysis integration.
- Arps / Duong / SEPD methods
- Probabilistic EUR (P10/P50/P90)
- Type curve development
Facilities Bottleneck Diagnostics
Production system optimization and debottlenecking across separators, compressors, pumps, and flowlines.
- Integrated network modeling
- Constraint analysis
- Process simulation
Economic Forecasting
NPV, IRR, sensitivity analysis, and Monte Carlo simulation for upstream investment decisions.
- Risk-adjusted valuation
- Portfolio optimization
- Full-cycle economics
Flow Assurance
Hydrate management, wax and asphaltene deposition modeling, thermal-hydraulic analysis, and subsea integrity.
- Hydrate prevention strategies
- Wax / asphaltene modeling
- Subsea flowline design
Well Testing
Pressure transient analysis, deliverability testing, skin and permeability determination, and fracture characterization.
- Pressure transient analysis (PTA)
- Deliverability testing
- Fracture characterization
Equipment Design
3D CAD modeling, FEA structural analysis, thermal simulation, and pressure vessel design for oil & gas facilities.
- Siemens NX / Solidworks
- Finite Element Analysis (FEA)
- Pressure vessel design
Industry-Standard & Specialized Tools
We leverage the most trusted software platforms, augmented by proprietary workflows.
What These Methods Typically Deliver
The improvements integrated, data-driven engineering is designed to unlock.
Through probabilistic integration of DCA + RTA + Material Balance
Flow assurance & facilities optimization
Through integrated field development planning
Typical ranges reported in industry case studies; actual results depend on the asset.
Validation & Calibration Framework
Every reservoir model we build is rigorously validated against historical production data before any forecast is generated. Our blind test protocols ensure predictions are truly predictive, not just curve-fit.
We document match quality metrics including R², RMSE, and normalized RMS error for pressure, rate, and water cut. Acceptance criteria: Pressure match within 5%, rate match within 10%, water cut trend correct.
Uncertainty Quantification Workflow
We quantify uncertainty at every stage — from input data to model assumptions to development scenarios. Our workflow integrates Monte Carlo simulation, Latin Hypercube sampling, and tornado chart sensitivity ranking.
Results are always presented with P10/P50/P90 confidence intervals. This probabilistic approach enables risk-adjusted investment decisions rather than single-point forecasts.
5-Gate Quality Control Process
Every TerraQuint deliverable passes through five rigorous quality gates before reaching the client. Each gate requires sign-off by a senior technical reviewer.
No deliverable is released without passing all five gates. Our peer review process includes cross-discipline review when projects span multiple technical domains.
Industry Standards & Cross-Checked Results
Our work is aligned with the frameworks the industry relies on: SPE-PRMS for reserves and resources, SEC guidelines for reserves reporting, and API / ASME codes for equipment design.
Key results are never taken from a single model. We cross-check them with an independent calculation or a second method, and document every assumption so you can see exactly how each number was reached.
Industry Benchmarking & Best Practices
We benchmark every study against SPE Petroleum Resources Management System (PRMS) guidelines and basin-specific type curves. Our EUR estimates are validated against public domain analogs and peer-reviewed publications.
Where gaps exist, we clearly document deviations and provide justification. This transparency ensures clients understand exactly how our estimates compare to industry norms.
Risk Assessment & Mitigation
Every project includes a formal risk register with probability-impact scoring. We identify, quantify, and propose mitigation strategies for all material risks.
Risks are categorized as geological, operational, or economic. Each receives a P10/P50/P90 range and a recommended mitigation path.
Confidentiality & Data Handling
Your field data is commercially sensitive, and we treat it that way. An NDA is in place before any data changes hands, and your data is used only for your project — never shared, never reused.
Files are exchanged through the secure platform you prefer, access is limited to the people working on your project, and everything is returned or deleted at the end of the engagement on request.
Senior-Led, Specialist-Backed
Every TerraQuint engagement is led by a senior petroleum engineer from kickoff to final delivery. The engineer you speak with is the engineer doing the work — no hand-offs to junior staff.
For specialized scopes, we draw on a trusted network of experienced associates across reservoir, production, EOR, CCS, flow assurance, and facilities engineering. Each project gets the right depth of expertise, without the overhead of a large firm.
Deliverable Quality Standards
Every client engagement includes a standardized deliverable package: technical report, model files, raw data, interactive dashboard, and presentation deck. All documents follow our corporate style guide and include complete metadata.
Model files are fully documented with comments, assumptions tables, and sensitivity cases. Clients receive everything needed to reproduce or extend our work.
Post-Engagement Support
Our commitment doesn't end at delivery. Every project includes a 30-day warranty period for questions, clarifications, and minor adjustments. We provide knowledge transfer sessions and optional model handover training.
For clients needing ongoing support, we offer retainer agreements for model maintenance, updates, and ad-hoc technical questions.